CONTRACTING

HIGH VOLTAGE 170kV SWITCHYARD
COORDINATED AC DRIVE SYSTEMS


PAPER INDUSTRY
     COORDINATED PAPER MACHINE DRIVES
     PUMP
     FAN & VACUUM
     PULPER, 1000kW
     CHIPPER

STEEL
     BOF TILT DRIVES, 2000A
     CRANE CONTROLS, 2500A
     ROLLER TABLES

Dil Ovası Industrial Park
Distribution of 200 MVA Energy to two hundred largest Turkish industrial companies located in Dil Ovası-Turkey. Scope covers engineering, design, metal clad switchgear, SCADA systems, revenue metering, cabling and civil works.

Hydro Power Projects
Berg has already energized Koyulhisar Hydro Plant and is about to complete Başak HEPP and Umut HEPP




Tüpraş
The Refinery is now upgraded to two new 75MVA, 154kV Transformers. Whole system which includes 36kV and 6kV Metal clad Switchgears comprising of 75 cubicles, 45 km MV Cables, complete SCADA System, State-of-the art Protection Relays etc.

Erdemir
154kV TM2 Switchgear Extention was successfully completed in October 25th, 2007

Eren Holding
Medium voltage system and MCC for PM4 project is completed and energized sucesfully.

Kardemir
New Blast Furnace Investment; Metal Clad Switchgear, MCC's Drives and Automation Systems are manufactured by Berg