logo
Power Plants
ENERGY DISTRIBUTION SYSTEM AUTOMATION

Berg Electric have been realizing energy monitoring protection and remote control of power distrubition system since 1991.We have numerous application experience in large steel mills,cement mills,cogeneration and textile plants.
these system provide remote monitoring of currents,voltages,active,and reactive power,status of circuit breakers etc.from long distances up to 2500 m.The operator can command circuit breakers,change transformer taps,synchronize,the busbar with the utility or cogeneration plant.

Cogeneration applications pertain serious risks in case of circuit breaker closure without synchronizing.Please consult us for your applications

Reference Image Reference Name Detail
 
KARAMAN SOLAR PP
Alaşehir Jeotermal Power Plant 24MW
Kayabeyi DAM and Akıncı HEPP and 154kV Switchyard - ARDAHAN
Pamukören Jeotermal Power Plant 2x22,5 MW
Gökbel I - Gökbel II Regulator and HEPP 154kV Switchyard - ISPARTA
ARC ENERJI Çamlıca HEPP
KANYON ENERJI Cenger I Regulator and HEPP - ANTALYA
BEREKET ENERJI Koyulhisar HEPP - SİVAS
BOYDAK ENERJI Tuna Regulator and HEPP - TOKAT
BOYDAK ENERJI Yaprak II Regulator, HEPP and 154kV Switchyard - AMASYA
BOYDAK ENERJI Yaprak I Regulator and HEPP - AMASYA
BOYDAK ENERJI Başak Regulator and HEPP - KASTAMONU
BOYDAK ENERJI Umut III Regulator and HEPP - ORDU
BOYDAK ENERJI Umut I Regulator, HEPP and 154kV Switchyard - ORDU
DEKAR ENERJI - Alabalık I-II Regulator and HEPP - ERZURUM
DARBOĞAZ ELECTRIC Alabalık I & II HES 16MW - Alabalık 1 & 2 HEPP 16MW
NISAN ENERGY
UMUT III HEPP 12MW
ISDEMIR KUVVET SANTRALI, Bara 5 200MW
DENİZLİ Cement 18MW
ERDEMİR Co-Gen Plant
NUH Cement Co-Gen Plant
KILER HOLDING Bitlis DAM and HEPP - BİTLİS
OZYER GROUP Deliçay I - Deliçay II Regulator and HEPP and 154kV Switchyard - ERZINCAN